Hope House Charity Store
Electrical Installation
This project comprised a full electrical overhaul including LED lighting, smart heating, and upgraded power distribution.
FULL ELECTRICAL OVERHAUL
LIGHTING, HEATING & POWER UPGRADE
LED LIGHTING
ENERGY-EFFICIENT PANELS & SPOTLIGHTS INSTALLED
SMART HEATING
NEW ELECTRIC UNITS WITH INTELLIGENT CONTROLS
POWER DISTRIBUTION
UPGRADED CONSUMER UNITS & SOCKET LAYOUTS
NICEIC CERTIFIED
FULLY TESTED & COMPLIANT WITH BS7671 STANDARDS
Case Study: Modernising Retail Spaces – Complete Electrical Installation for Hope House Charity Store, Chester
Hope House Charity undertook a full refurbishment of their retail store in Chester to create a more modern, energy-efficient, and welcoming space for customers and staff.
M J Wallace Limited was appointed as the electrical contractor to deliver a complete overhaul of the store’s electrical systems – transforming the environment with safe, efficient, and sustainable solutions.
Challenge
The existing electrical infrastructure was outdated and inefficient, resulting in high energy consumption and limited functionality.
Key challenges included:
- Ageing fluorescent lighting with poor brightness and high maintenance costs.
- Inconsistent heating that affected customer comfort.
- Limited power distribution unable to support new displays and store technology.
- The need to complete works quickly to minimise disruption to retail operations.
Solution
M J Wallace Limited delivered a full electrical upgrade tailored to the store’s layout, operational needs, and energy goals.
Scope of Work
- LED Lighting Installation: Replaced outdated fittings with modern, high-efficiency LED panels and spotlights to improve brightness and reduce electricity use.
- Heating System Upgrade: Installed new electric heating units with smart controls for optimal comfort and energy management.
- Power Distribution: Reconfigured and upgraded the store’s power layout, including new sockets, consumer units, and circuit protection.
- Compliance & Certification: All installations were completed to BS7671 standards, with NICEIC certification provided on completion.
Our Approach
From initial consultation to final handover, M J Wallace Limited worked collaboratively with the Hope House Charity team to ensure smooth project delivery.
We conducted a full site survey to assess requirements, created a detailed installation plan, and coordinated closely with the refurbishment schedule to avoid disruption.
Our in-house team managed every stage – from design and installation to testing and certification – ensuring the project was delivered safely, on time, and within budget.
Benefits
- ⚡ Energy Efficiency: LED lighting and efficient heating systems significantly reduce electricity consumption and running costs.
- 💡 Enhanced Customer Experience: Brighter lighting and improved climate control create a more comfortable and inviting retail environment.
- 🔌 Future-Ready Infrastructure: Upgraded power systems support modern equipment and future technology upgrades.
- 🛡️ Safety & Compliance: The store now benefits from a fully certified electrical system meeting the latest BS7671 standards.
Results
Following completion, the Hope House Charity Store in Chester has seen a transformative improvement in energy performance and customer experience.
- Noticeable reduction in electricity usage and maintenance costs.
- A bright, modern retail space aligned with the charity’s welcoming brand image.
- Reliable and compliant electrical systems supporting long-term operational needs.
- Positive feedback from both staff and visitors on the improved lighting and comfort levels.